Food Establishment Inspection Report |
||||||||||||||||||||||||||
Page 1 of ????????? | ||||||||||||||||||||||||||
|
|
FOODBORNE ILLNESS RISK FACTORS AND PUBLIC HEALTH INTERVENTIONS |
Circle designated compliance status (IN, OUT, N/O, N/A) for each numbered item IN=in compliance OUT=not in compliance N/O=not observed N/A=not applicable Mark "X" in appropriate box for COS and/or R COS=corrected on-site during inspection R=repeat violation |
Risk factors are important practices or procedures identified as the most prevalent contributing factors of foodborne illness or injury. Public health interventions are control measures to prevent foodborne illness or injury. |
|
|
GOOD RETAIL PRACTICES |
Good Retail Practices are preventative measures to control the addition of pathogens, chemicals, and physical objects into foods. Mark "X" in appropriate box for COS and/or R COS=corrected on site during inspectionR=repeat violation |
|
|
IOCI 17-356
![]() |
Food Establishment Inspection Report |
|
Page 2 of ?????? | |
Establishments: EVA'S PIZZA | Establishment #: PE002 |
Water Supply: Public Private Waste Water System: Public Private |
Sanitizer Type: Chemical | PPM: | Heat: °F |
CFPM Verification (name, ID#, expiration date): | |||
KIMBERLY GARFIAS 1721436552-111-180509 07/19/2029 |
01/01/1900 |
01/01/1900 |
|
OBSERVATIONS AND CORRECTIVE ACTIONS |
Item Number |
Severity | Violations cited in this report must be corrected within the time frames below. |
Inspection Comments |
CONSULTATION FOR REMODEL OF AN EXISTING NON-FOOD LOCATION. PROVIDED PLAN REVIEW AND DISCUSSED:
-MENU: PIZZA, ITALIAN BEEF, HAMBURGERS, CHICKEN WINGS, PRECOOKED FRIED FOODS -EQUIPMENT: ALL MUST BE COMMERCIAL, NSF OR ANSI APPROVED -PLUMBING: WILL NEED HAND WASHING SINK, 3-COMPARTMENT SINK, AND SERVICE SINK. SPEAK WITH PLUMBING INSPECTOR ON REQUIREMENTS FOR A FLOOR DRAIN AND GREASE TRAP. -CFPM -FOOD HANDLER -ALLERGEN AWARENESS -1B FORMS -FLOORS, WALLS, CEILINGS -BATHROOM -TRASH REMOVAL -FOOD THERMOMETER -SANITIZER SOLUTION AND TEST STRIPS SUBMIT YOUR PLAN REVIEW AS SOON AS POSSIBLE TO AVOID ANY CONSTRUCTION OR OPENING DELAY. |
HACCP Topic: |
Person In ChargeKIM GARFIAS |
Date:02/22/2024 |
InspectorDANA JAMES |
Follow-up: Yes No Follow-up Date: |